From May 2013 till December 2013 SIA “WATEX” carried out a project in Ozolnieki, Ozolnieki district within the project “Water treatment plant and second uplift pumping station design and construction works in Ozolnieki, Ozolnieki district”. Within project, SIA “WATEX” implemented the following works:
- Installed water treatment plant (q=50m3/h) with stainless steel assembly connections;
- Installed air supply system for filter aeration;
- Installed air supply system for filter flushing;
- Installed water disinfection system;
- Set up nanofiltration unit (Q=15m3/h);
- Installed second uplift pumping station (Qmax=169m3/h);
- Set up SCADA system for process visualization;
- Reconstructed old borehole assembly connections from stainless steel;
- Installed assembly connections from stainless steel for new borehole;
- Completed construction works in high quality.
In the end of project customer was provided with water that meets all demands of Latvian legislation.